Central New Mexico Electric Coop Capilla Transmission Line
Proposal to convert existing aerial transmission line to sub-surface. Includes removal of 33 power poles and installation of approximately 4,224 feet of sub-surface line along the existing right-of-way adjacent to CR B067.
Project Summary
Location Summary:
Along the existing right-of-way near CR B067, Capilla Peak Road from the NFS boundary to Capilla Peak
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/28/2024 |
Decision | 07/2025 (Estimated) |
Implementation | 08/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mountainair Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
In Progress
Forests:
Cibola National Forest
Districts:
Mountainair Ranger District
States:
New Mexico
Counties:
Torrance
Legal Land Description:
T. 5N., R. 5E., Sections 3, 4, 9, 10, 11, 12, 14, 15; T. 6N., R. 5E., Section 34, NMPM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christian Larson
P.O. Box 69
Mountainair, NM 87036-0069
719-636-1602
Christian.Larson@usda.gov
Last Updated: 6/30/2025