Skip to main content

Central New Mexico Electric Coop Capilla Transmission Line

Proposal to convert existing aerial transmission line to sub-surface. Includes removal of 33 power poles and installation of approximately 4,224 feet of sub-surface line along the existing right-of-way adjacent to CR B067.

Project Summary

Last Updated: 6/30/2025