The Saint Minerals Project Proposed Plan of Operations (Revised)
The District Ranger has signed the CE/DM authorizing the Saint Minerals Project. The proponent will conduct exploratory mining over a 1-acre parcel of FS land. Holes will be dug by hand, mini excavator, or backhoe. Over the course of a 5-year period up to 25 holes may be dug down to bedrock, no more than 2 at a time.
Project Summary
Current Status:
Completed
Location Summary:
Approximately 1 mile west of Placerville on FSR 343
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 01/17/2020 |
| Comment Period | 01/17/2020 |
| Decision | 04/2021 (Estimated) |
| Implementation | 05/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Boise National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Project Decision Information
The Saint Minerals Project Proposed Plan of Operations (Revised)
Decision Signed Date: 04/06/2021
Forests:
Boise National Forest
Districts:
Idaho City Ranger District
States:
Idaho
Counties:
Boise
Legal Land Description:
T7N-R4E-Sec 15
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Travis Whitman
1249 S. Vinnell Way, Suite 200
Boise, ID 83709
1-208-392-3719
travis.whitman@usda.gov
Last Updated: 4/6/2021