Skip to main content

Sunshine Exploration Project

There are seven proposed drill sites. The number of drill holes at each site may vary with a maximum of three. Both vertical and angle holes may be drilled. Roughly 1.75 miles of existing road may be used temporarily.

Project Summary

Last Updated: 7/31/2023