Skip to main content

Virginia Tech Small Seismometer Line Project

Placement of small seismometers every 100-500 meters along the sides of existing roads and trails. To be placed for 2 to 8 days in areas previously disturbed by rd construct. or within 18 in of travel surface. Holes will be 6" wide, 6" deep, 18" long

Project Summary

Last Updated: 5/17/2012