Skip to main content

Beartrack Exploration Drilling

Proposes a 34-hole drilling program 6/1/13. Based on drill results the program may be terminated or extended to 2014. If the entire program is implemented, disturbance will result in a maximum of 7.5 acres. Located 12 miles north of Salmon, ID.

Project Summary

Last Updated: 6/17/2013