Skip to main content

Pope-Shenon drilling and trenching

This Plan of Operation includes: 1) trenching and 2) drilling and 3) road maintenance. Trenching: It is anticipated that 10 to 12 trenches may be excavated Drilling: Neuma proposes drilling a total of 10 to 15 diamond core holes

Project Summary

Last Updated: 7/13/2022