McCurtain County Waterline Installation
Install a six inch waterline within FS Road 52680 corridor to provide water from a main to a development west of Highway 259. Digging, trenching and burying would occur within an area 1490 feet long by 15 feet wide.
Project Summary
Location Summary:
Approximately two miles northwest of Hochatown, Oklahoma.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/13/2017 |
Decision | 04/2017 (Estimated) |
Implementation | 05/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Kiamichi Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
McCurtain County Waterline Installation Project
Decision Signed Date: 04/18/2017
Forests:
Ouachita National Forest
Districts:
Kiamichi Ranger District
States:
Oklahoma
Counties:
McCurtain
Legal Land Description:
Section 27, Township 4 South, Range 24 East
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
John Reffit
111 South State Highway 259-A
Broken Bow, OK 74728
580-494-6402
johnareffit@fs.fed.us
Last Updated: 7/18/2017