Old Job Bridge Replacement
Removal and replacement of bridge along the Appalachian Trail/Long Trail; includes trail construction to tie in replaced bridge with existing trail.
Project Summary
Location Summary:
Town of Mount Tabor, Manchester Ranger District
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/23/2007 |
Decision | 03/2009 (Estimated) |
Implementation | 08/2009 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Manchester Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management; Recreation Management
Project Activity:
Facility Improvements/Construction; Dispersed Recreation Mgmt.; Travel Management
Current Status:
Completed
Project Decision Information
Design and Replacement of Old Job Bridge
Decision Signed Date: 03/06/2009
Forests:
Green Mountain And Finger Lakes National Forests
Districts:
Manchester Ranger District
States:
Vermont
Counties:
Rutland
Legal Land Description:
Land within the Town of Mount Tabor, Manchester Ranger District
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Douglas Reeves
2538 Depot Street
Manchester Center, VT 05255
802-362-2307 x224
dreeves01@fs.fed.us
Last Updated: 3/27/2009