Western Slope Trail Right of Way Special Use Permit
Issue a 20 year Trail Right of Way permit to the Town of Granville to construct, operate and maintain a hiking trail. Work would include vegetation clearing, constructing drainage features and a 16 foot bridge for a total of 1.75 acres. Cancelled.
Project Summary
Location Summary:
Town of Granville
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/2018 (Estimated) |
Decision | 08/2018 (Estimated) |
Implementation | 08/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Rochester Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Trail Management
Current Status:
Cancelled
Forests:
Green Mountain And Finger Lakes National Forests
Districts:
Rochester Ranger District
States:
Vermont
Counties:
Addison
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Edmonds
99 Ranger Road
Rochester, VT 05767
802-747-6746
jedmonds@fs.fed.us
Last Updated: 9/28/2018