Skip to main content

Mount Snow Upper Carinthia Bypass Power and Communications Install

Project Cancelled - NEPA analysis no longer needed because the action was modified to fit within an existing pre-disturbed trail corridor and is covered by the ski area permit maintenance annual operating plan.

Project Summary

Last Updated: 3/29/2021