Dunn Road Water Control Structure Replacement
The purpose of this project is to replace the failing water control structure on the pond/wetland along Dunn Road and enhance the pond/wetland by dredging.
Project Summary
Location Summary:
Along Dunn Road in the Town of Covert
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 11/2022 (Estimated) |
| Decision | 01/2023 (Estimated) |
| Implementation | 09/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hector Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management
Project Activity:
Watershed Improvements
Current Status:
Cancelled
Forests:
Green Mountain And Finger Lakes National Forests
Districts:
Hector Ranger District
States:
New York
Counties:
Seneca
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Gregory Flood
5218 State Route 414
Hector, NY 14841
607-546-4470
gregory.flood@usda.gov
Last Updated: 9/8/2023