Clark Right of Way Reconstruction Special Use Permit

Issuance of a special use permit with a term of two years, authorizing work on the existing right of way. Fourteen hardwood trees would be cut and left in place, and the entire length of the right of way would be resurfaced with crushed stone.

Project Summary

Last Updated: 6/3/2024