Skip to main content

278 McCollan Re-route Watershed Restoration

Re-route 3 drainages into one culvert to prevent flooding onto private property. Two of the drainages will be rocked with limestone to buffer acid mine drainage from a discharging portal, and the 3rd drainage will be rocked to minimize erosion. Decision signed 01/09/2009.

Project Summary

Last Updated: 10/14/2009