American Electric Power Amendment 5
American Electric Power has applied for a permit to install a section of overhead power line. New poles and power line will be placed outside of the easement. A right-of-way will be cleared for maintenance, which will be 560 ft. long & 15 ft. wide.
Project Summary
Location Summary:
Near intersection of Hwy 93 and County Rd. 4.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/08/2016 |
| Decision | 06/2016 (Estimated) |
| Implementation | 08/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wayne National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Completed
Project Decision Information
American Electric Power Amendment 5
Decision Signed Date: 06/22/2016
Forests:
Wayne National Forest
Districts:
Ironton Ranger District
States:
Ohio
Counties:
Lawrence
Legal Land Description:
T2N, R18W Sec. 22
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joseph Wood
13700 US Highway 33
Nelsonville, OH 45764
740-534-6533
josephbwood@fs.fed.us
Last Updated: 6/28/2016