AEP 138kv Overhead Transmission Line
American Electric Power requested a special use authorization for construction of a overhead transmission line on 5 separate parcels crossing National Forest system lands. Additional construction would occur on lands for which AEP holds easements.
Project Summary
Location Summary:
Washington and Monroe Counties from the Devola Sub Station to the Bell Ridge Sub Station.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/07/2019 |
Decision | 11/2020 (Estimated) |
Implementation | 11/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Athens Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
AEP 138kv Overhead Transmission Line
Decision Signed Date: 11/03/2020
Forests:
Wayne National Forest
Districts:
Athens Ranger District
States:
Ohio
Counties:
Monroe; Washington
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Christopher Yeager
27750 State Route 7
Marietta, OH 45750
740-373-5017
christopher.s.yeager@usda.gov
Last Updated: 1/7/2021