| Collection: | RMRS Archive Images |
| Keywords: |
watershed structures watershed research watershed management |
| Location: | Bar M, Beaver Creek Experimental Watershed; AZ; United States |
| Description: | Boris is cutting off a master lock for the BarM gondola that had been rusted should over the years. |
| Date: | 04/01/2005 |
| Collection: | RMRS Archive Images |
| Keywords: |
stream gage watershed structures watershed research watershed management |
| Location: | Bar M, Beaver Creek Experimental Watershed; AZ; USA |
| Description: | Boris is inspecting the debris deposited behind the stilling well from the gondola. |
| Date: | 04/01/2005 |
| Collection: | RMRS Archive Images |
| Keywords: |
watershed structures watershed research watershed management |
| Location: | Bar M, Beaver Creek Experimental Watershed; AZ; USA |
| Description: | Boris and Duncan had to use the gondola to cross Bar M canyon in order to inspect damage caused by winter and spring flow events. |
| Date: | 04/01/2005 |
| Collection: | RMRS Archive Images |
| Keywords: |
watershed structures watershed research watershed management |
| Location: | Bar M, Beaver Creek Experimental Watershed; AZ; USA |
| Description: | Boris is standing at the highest flood level mark of the winter and spring flow events as determined by the remaining debris. |
| Date: | 04/01/2005 |




