Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Occurring in more than one District (excluding Forestwide) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Eagle River-Florence Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Great Divide Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Lakewood-Laona Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Medford-Park Falls Ranger District (excluding Projects occurring in more than one District) - R9 - Eastern Region, Chequamegon / Nicolet National Forest, Washburn Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Land Management Plan Direction for Old-Growth Forest Conditions Across the National Forest System EIS |
- Land management planning |
In Progress: DEIS NOA in Federal Register 06/21/2024 Est. FEIS NOA in Federal Register 12/2024 |
Expected:01/2025 |
01/2025 |
Jennifer McRae 202-791-8488 SM.FS.NFSWONGA@usda.gov |
Description: Amend all land management plans for units of the National Forest System to include consistent direction to conserve and steward existing and recruit future old-growth forest conditions and to monitor their condition across planning areas of NFS.
Web Link: http://www.fs.usda.gov/project/?project=65356 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. National Forests and Grasslands (128 units). | |||||
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Occurring in more than one District (excluding Forestwide) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
2024 Special Use Application Project - Fall Batch CE *UPDATED* |
- Special use management | Completed | Actual: 09/25/2024 | 09/2024 |
Kelly Scarbrough 715-362-1314 Kelly.Scarbrough@usda.gov |
Description: To authorize requests for 10 special use permits on Forest Service Lands.
Web Link: http://www.fs.usda.gov/project/?project=66508 |
|||||
Location: UNIT - Eagle River-Florence Ranger District, Lakewood-Laona Ranger District, Washburn Ranger District, Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland, Bayfield, Oconto, Sawyer, Vilas. LEGAL - Not Applicable. Located across four districts. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Eagle River-Florence Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Hemlock Lake Wildlife Openings Prescribed Burn CE *UPDATED* |
- Wildlife, Fish, Rare plants - Fuels management |
Developing Proposal Est. Scoping Start 11/2024 |
Expected:12/2024 | 03/2025 |
Jesse Harrand 715-528-4464 x 2807 jesse.harrand@usda.gov |
Description: Hemlock Lake wildlife openings are in Florence County near FS Rd 2446 and LeRoy Creek. There are 12 wildlife openings, totaling 64 acres, that would be prescribed burned to enhance wildlife habitat.
Web Link: http://www.fs.usda.gov/project/?project=65837 |
|||||
Location: UNIT - Eagle River-Florence Ranger District. STATE - Wisconsin. COUNTY - Florence. LEGAL - Not Applicable. T41N R16E Sections 6 & 7, T41N R15E Sections 1& 12. | |||||
Town of Alvin ROW Maintenance CE *UPDATED* |
- Road management |
Developing Proposal Est. Scoping Start 09/2024 |
Expected:11/2024 | 01/2025 |
Daniel Reynolds 715-479-2827 ext 2723 daniel.reynolds2@usda.gov |
Description: The Town of Alvin has requested that the Forest Service conduct a timber sale to remove merchantable trees within the road right of ways. This is for safer travel and easier snow removal.
Web Link: http://www.fs.usda.gov/project/?project=65313 |
|||||
Location: UNIT - Eagle River-Florence Ranger District. STATE - Wisconsin. COUNTY - Forest. LEGAL - T41N, R13E, Sections 20, 25, 28-29,33-34; T41N, R14E, Sections 21-23, 25-32, 34, 36; T40N, R13E, Sections 3, 9-16, 21-22, 27-28, 33; T40N, R14E, Sections 1-2, 4, 10-11, 13-18, 20, 22-24, 26-29, 32-36. 49 miles of road within the Alvin Township. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Great Divide Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Forest Lodge Nature Trail Trailhead Parking Area and Traffic Circulation CE *UPDATED* |
- Watershed management - Facility management |
In Progress: Scoping Start 05/28/2021 |
Expected:12/2024 |
12/2024 |
Nicole Molitor 715-638-0272 nicole.g.molitor@usda.gov |
Description: Improve Forest Lodge road and trail infrastructure to accommodate increased use of Forest Lodge and the Nature Trail - parking, road and trail capacity, drainage, stormwater treatment, traffic sight lines within the complex and ingress and egress.
Web Link: http://www.fs.usda.gov/project/?project=58868 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Forest Lodge is located about eight miles east of Cable, Wisconsin. | |||||
Forest Road 164 Reconstruction EA *UPDATED* |
- Road management |
In Progress: Scoping Start 01/31/2022 Est. Comment Period Public Notice 09/2024 |
Expected:05/2025 |
05/2025 |
Eric Lynch 715-762-5137 eric.lynch@usda.gov |
Description: The 11.6-mile-long project area will be cleared and grubbed within 16 feet of the road centerline or as needed to create ditching. All cross-drain culverts will be replaced with polymer coated arch pipes. The entire road length will be resurfaced.
Web Link: http://www.fs.usda.gov/project/?project=61289 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Forest Road 164 between County Highway GG and Forest Road 163. | |||||
Forest Road 182 Segment Reroute CE *UPDATED* |
- Road management |
In Progress: Scoping Start 03/19/2024 |
Expected:05/2025 |
05/2025 |
Eric Lynch 715-762-5137 eric.lynch@usda.gov |
Description: A 1.22-mile reroute is proposed to improve the operation of the road and avoid a wetland that is regularly in need of gravel application.
Web Link: http://www.fs.usda.gov/project/?project=65857 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - T43N R4@ Sections 22, 23, 26, 27. Forest Road 182 segment northeast of Clam Lake. | |||||
Jump River Electric Cooperative 2024-2027 Construction Workplan Project Codes 323-324-325 CE *UPDATED* |
- Special use management | Completed | Actual: 07/03/2024 | 07/2024 |
Nicole Molitor 715-634-4821, x 2327 nicole.g.molitor@usda.gov |
Description: About 6.6 miles of two-phase 6A CW overhead powerline will be replaced with single-phase 1/o AL underground powerline for a total of 1.76 acres of disturbance. Aging facilities will be replaced allowing for new load balancing in the area.
Web Link: http://www.fs.usda.gov/project/?project=66229 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Project Code 323 - 2.8 miles south and west of Lost Land Lake. Project Code 324 - 2.4 miles north of STH 77 between Lost Land and Teal Lakes. Project Code 325 - 1.4 miles east of Teal Lake. | |||||
Norvado Fiber Optic Installation EA *UPDATED* |
- Special use management | Completed | Actual: 07/03/2024 | 07/2024 |
Nicole Molitor 715-638-0272 nicole.g.molitor@usda.gov |
Description: Installation of underground fiber optic cable in portions of National Forest System land along State Highway 77, County Road S, Sams Lane, and Forest Roads 164, 174, 308, and 1661.
Web Link: http://www.fs.usda.gov/project/?project=65949 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Right of Ways for State Highway 77, County Road S, Sams Lane, Forest Roads 164, 174, 308, and 161 south of Clam Lake, WI. | |||||
Penokee Trail Network Rehabilitation and Reconstruction CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 12/26/2023 |
Expected:12/2024 |
12/2024 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: Rehabilitation and reconstruction of 10.5 miles of cross-country ski/snowshoe trail that is also used as a hiking trail in the summer.
Web Link: http://www.fs.usda.gov/project/?project=65412 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Ashland. LEGAL - Not Applicable. Off of County Highway GG about five miles southwest of Mellen, WI. | |||||
Snowmobile Trail 5 - Reroute off Highway 77 to Forest Road 1648B CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 10/2024 |
Expected:11/2024 | 11/2024 |
Jenifer Bratsch 715-373-2667 x5235 Jenifer.Bratsch@usda.gov |
Description: About 0.38 of a mile of Snowmobile Trail 5 would be rerouted from the Highway 77 right-of-way on to Forest Road 1648B. About 0.05 of a mile of trail would need to be constructed. | |||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Sawyer. LEGAL - Not Applicable. Highway 77. | |||||
Snowmobile Trail 8 Reroute and Rehabilitation in Clam Lake Area CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 12/26/2023 |
Expected:11/2024 |
11/2024 |
Jenifer Bratsch 715-373-2667 x5235 Jenifer.Bratsch@usda.gov |
Description: Snowmobile trail 8 reroute in the Clam Lake area.
Web Link: http://www.fs.usda.gov/project/?project=65413 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Bayfield, Sawyer. LEGAL - Not Applicable. Clam Lake area. | |||||
Veikko Trail Improvement and Development CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 05/01/2023 |
Expected:11/2024 |
11/2024 |
Katherine LeMoine 715-634-4821 x2326 katherine.lemoine@usda.gov |
Description: The Veikko Trail, an old cross-country ski trail in the St. Peter's Dome area developed by a local ski group, will be improved and realigned to fix drainage issues. Additional trail will be developed to connect to the St. Peter's Dome Trail network.
Web Link: http://www.fs.usda.gov/project/?project=58459 |
|||||
Location: UNIT - Great Divide Ranger District. STATE - Wisconsin. COUNTY - Forest. LEGAL - Not Applicable. St. Peter's Dome area. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Lakewood-Laona Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Armstrong Creek Trail Reroute CE *UPDATED* |
- Recreation management | Cancelled | N/A | N/A |
Evan Miller 715-674-4481 evan.miller@usda.gov |
Description: Snowmobile Trail Reroute moving off a paved road
Web Link: http://www.fs.usda.gov/project/?project=65369 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Forest. LEGAL - Not Applicable. T36N R16E Sec 12,13. | |||||
CCI Systems, Inc Reconstruction and Maintenance of Telephone/Utility Lines CE *UPDATED* |
- Special use management |
Developing Proposal Est. Scoping Start 09/2024 |
Expected:11/2024 | 03/2025 |
Casey Swanson 715-362-1300 Casey.Swanson@usda.gov |
Description: CCI Systems, Inc needs permit for existing line to reconstruct and continue maintenance across the district.
Web Link: http://www.fs.usda.gov/project/?project=66128 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Forest, Oconto. LEGAL - Not Applicable. Scattered though the district. | |||||
Jones Springs Project EA |
- Recreation management | On Hold | N/A | N/A |
Evan Miller 715-674-4481 evan.miller@usda.gov |
Description: This recreation area was heavily impacted by the 2019 blowdown. This project is reviewing the recreation opportunities in the area to see if any changes are needed.
Web Link: http://www.fs.usda.gov/project/?project=59902 |
|||||
Location: UNIT - Lakewood-Laona Ranger District. STATE - Wisconsin. COUNTY - Langlade, Oconto. LEGAL - Not Applicable. The Jones Springs area, legal T33N, R14 and R15E; T32N, R14 and 15 E. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Medford-Park Falls Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Clark Electric Overhead Conversion 2024 CE *UPDATED* |
- Special use management | Completed | Actual: 07/24/2024 | 08/2024 |
Matthew Monahan 715-762-2461 Ext. 5125 matthew.monahan@usda.gov |
Description: Clark Electric is proposing to convert 11,280 feet of overhead utility line to underground along FR 119. The conversion will take place in Clark Electric's current right of way. One segment will be relocated from Lake Marion to the 119 right of way.
Web Link: http://www.fs.usda.gov/project/?project=65766 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Taylor. LEGAL - T31N, R2W, Secs. 4,8,9,16,17. The project will take place between FR 554 and FR 121 in the existing right of way of FR 119. | |||||
John's Creek Gravel Pit Expansion EA |
- Minerals and Geology | On Hold | N/A | N/A |
Jennifer Maziasz 616-581-5756 jennifer.maziasz@usda.gov |
Description: This project consists of expansion of an existing gravel pit to meet road construction, re-construction, and maintenance needs in the project vicinity. This is an existing pit that has an additional source of gravel that has not been developed.
Web Link: http://www.fs.usda.gov/project/?project=54736 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Taylor. LEGAL - Not Applicable. Town of Grover, Township 31 North, Range 2 West, Section 7, Taylor County, Wisconsin. | |||||
Joseph Creek #34 Trail Bridge Replacement CE *NEW LISTING* |
- Watershed management |
Developing Proposal Est. Scoping Start 09/2024 |
Expected:11/2024 | 11/2024 |
Matthew Monahan 715-748-4875 Ext 7484834 matthew.monahan@usda.gov |
Description: The proposal is to replace the current bridge over Joseph Creek along the Perkinstown ATV Trail. The current bridge is failing and undersized. The bridge is located approximately 1/2 mile from FR 119.
Web Link: http://www.fs.usda.gov/project/?project=66816 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Taylor. LEGAL - (SW ?; NE ?; Sec 8; T31N; R2W, Grover Township, Taylor County). The project is located approximatley 1/2 mile west of FR 119 and 2 miles south of Perkinstown in Taylor County. | |||||
Kidrick Vegetation Management EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Road management |
Completed | Actual: 08/29/2024 | 08/2024 |
Matthew Monahan 715-762-2461 Ext. 5125 matthew.monahan@usda.gov |
Description: This project is primarily a vegetation management project with focus on mid to late successional hardwood forest. Primary purpose is to maintain forest health and diversity. Project will also include a transportation analysis.
Web Link: http://www.fs.usda.gov/project/?project=50889 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - Not Applicable. Project is located in the northwest portion of the Forest within Taylor County in T32N, R2-3W and T33N, R1-3W. | |||||
Round Lake Fish Passage and Water Level Control CE |
- Watershed management | On Hold | N/A | N/A |
Matthew Monahan 715-762-2461 Ext. 5125 matthew.monahan@usda.gov |
Description: The project will consist of reestablishing a two-way fish passage and reconnect the ecosystems of the Pike Lake Chain of Lakes and the South Fork Flambeau River.
Web Link: http://www.fs.usda.gov/project/?project=55358 |
|||||
Location: UNIT - Medford-Park Falls Ranger District. STATE - Wisconsin. COUNTY - Price. LEGAL - Not Applicable. T40N, R3E, Sections 23-26, Price County, WI. | |||||
Back To Top | |||||
Chequamegon / Nicolet National Forest, Washburn Ranger District (excluding Projects occurring in more than one District) |
R9 - Eastern Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Enbridge Energy Limited Partnership SUP CE |
- Special use management | On Hold | N/A | N/A |
Jennifer Maziasz 715-373-2667 comments-eastern-chequamegon-nicolet-washburn@usda.gov |
Description: The proposal is to re-issue a special use authorization for a new term for Enbridge Energy Limited Partnership's existing pipeline system, pumping station, and associated improvements.
Web Link: http://www.fs.usda.gov/project/?project=44889 |
|||||
Location: UNIT - Washburn Ranger District. STATE - Wisconsin. COUNTY - Bayfield. LEGAL - Not Applicable. Project includes 11.5 miles of existing pipeline system, the pumping station, and associated improvements on Forest Service lands north of US Highway 2. | |||||
Peerless Vegetation and Transportation Project EA *UPDATED* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Objection Period Legal Notice 08/08/2024 |
Expected:10/2024 |
11/2024 |
Sarah Holmes 715-373-2667 sarah.holmes@usda.gov |
Description: Vegetation Management actions would include clearcut and shelterwood systems to regenerate oak, aspen, and pine, and thinnings to promote growth and vigor in pine plantations. Associated actions: updating road system and improving wildlife habitat.
Web Link: http://www.fs.usda.gov/project/?project=65086 |
|||||
Location: UNIT - Washburn Ranger District. STATE - Wisconsin. COUNTY - Bayfield. LEGAL - Not Applicable. Project is located in the central portion of the Washburn Ranger District. The project area is about 5 miles east of Iron River, WI. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |