Basin Electric Geotechnical Soil Investigations
The geotechnical investigation would drill 12 boreholes with a max. borehole diameter of 6 in. and varying from 30-40 ft using an all-terrain rig with a footprint of approx. 210 sq feet. This investigation is needed to determine soil characteristics.
Project Summary
Location Summary:
The geotechnical investigation is proposed in sections 21, 25, and 35, T.145N, R98.W, Section 18, T.147N., R98W., and sections 13 and 24, T.147N., R99W., 5th PM, McKenzie County, North Dakota.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/15/2014 |
Decision | 08/2014 (Estimated) |
Implementation | 09/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Dakota Prairie Grasslands All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Basin Electric Geotechnical Soil Investigations
Decision Signed Date: 08/29/2014
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jeff Ingalls
2000 Miriam Circle
Bismarck, ND 58501
701-842-2393
jingalls@fs.fed.us
Last Updated: 10/19/2016