2012 Sipapu Ski Area Summer Operations Projects
Improve building at base lift 1; loading area at lift 2; and portions of runs including Bambi, Lower Bambi, Rolling Rock, and Gamble Trees. Install 815' snowmaking line in Gamble Trees run. All projects in existing special use permit boundary.
Project Summary
Location Summary:
Within the bounds of the Sipapu Ski Area
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/10/2012 |
Comment Period | 07/12/2012 |
Decision | 09/2012 (Estimated) |
Implementation | 10/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Camino Real Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
2012 Sipapu SKi Area Summer Projects Decision Memo
Decision Signed Date: 09/05/2012
Legal Notice Date: 09/13/2012
Forests:
Carson National Forest
Districts:
Camino Real Ranger District
States:
New Mexico
Counties:
Taos
Legal Land Description:
T. 22N, R. 13E, sections 10 and 15
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Amy Simms
P.O. Box 68
Penasco, NM 87553
575-587-2255
comments-southwestern-carson-caminoreal@fs.fed.us
Last Updated: 9/24/2012