Skip to main content

Forest Trail 70 Improvement

Repair and establish drainage structures along 4 miles of existing motorized trail. Construct a 100 ft. by 100 ft. parking area at the north trailhead, grade and surface the south trailhead. Install barriers to prevent full-size vehicle use of trail. Questions about the project can be directed to Amy Simms at 575-587-2255.

Project Summary

Last Updated: 4/25/2013