Improvements at Treasure Park Campground, Water System Taps and Lines
The Forest proposes to add two water taps to the existing water line at Treasure Park. One would be located at the Treasure Park North campsite and the other at Treasure Park East with the water lines running under the existing roads.
Project Summary
Location Summary:
Treasure Park Campground
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/2016 (Estimated) |
Decision | 09/2016 (Estimated) |
Implementation | 10/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (5), 36 Cfr 220.6(D)(5)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Safford Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management
Project Activity:
Facility Improvements/Construction
Current Status:
Cancelled
Forests:
Coronado National Forest
Districts:
Safford Ranger District
States:
Arizona
Counties:
Graham
Legal Land Description:
- Sec 10, Township 9 South, Range 24 East
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Barbara Ramey
P.O. Box 709
Safford, AZ 85548-0709
661-296-9710 ext. 247
bramey@fs.fed.us
Last Updated: 6/26/2020