Rosemont Amendment to the Revised Forest Plan
A proposal to amend the revised Coronado Forest Plan in the Santa Rita Mountains in Pima County, Arizona to ensure consistency between the Rosemont Copper decision (June 6, 2017) and the recently revised Coronado Forest Plan.
Project Summary
Location Summary:
The project area is located in the Barrel Canyon drainage in the northeast area of the Santa Rita Mountains on the Nogales Ranger District, Coronado National Forest.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/2019 (Estimated) |
Comment Period | 05/2019 (Estimated) |
Objection Period Start | 07/2019 (Estimated) |
Decision | 10/2019 (Estimated) |
Implementation | 10/2019 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Coronado National Forest All Units
Notice and Comment Regulation:
219 (2012)
Project Purpose:
Land Management Planning; Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Plan Amendment
Current Status:
Cancelled
Forests:
Coronado National Forest
Districts:
Coronado National Forest All Units
States:
Arizona
Counties:
Pima
Legal Land Description:
in Townships 18 and 19, Ranges 15 and 16, Gila/Salt River Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Rosamond Robinson
300 W. Congress Street
Tucson, AZ 85701
520-388-8491
rosamondrobinson@fs.fed.us
Last Updated: 4/15/2025