Perk Bridge Culvert
The current bridge on Perk Canyon is old and needs replacement. The bridge would be replaced with a culvert that is appropriate for the size of the drainage and expected vehicle weight. The road at the work site may be closed during construction.
Project Summary
Location Summary:
The location of the project is on Perk Canyon Rd. 171 just upstream of the intersection with Rd. 265 (Hughes Canyon).
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 02/01/2018 |
| Decision | 03/2018 (Estimated) |
| Implementation | 03/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lincoln National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance
Current Status:
Completed
Project Decision Information
Perk Bridge Culvert Replacement
Decision Signed Date: 03/02/2018
Forests:
Lincoln National Forest
Districts:
Sacramento Ranger District
States:
New Mexico
Counties:
Otero
Legal Land Description:
T18S, R13E, Sec. 13
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Rafael Castanon
3463 Las Palomas
Alamogordo, NM 88310
575-434-7373
rafaelcastanon@fs.fed.us
Last Updated: 3/5/2018