Town of Afton Hydropower
Authorize the Town of Afton to use 8 acres of NF System Land to construct, operate and maintain a 225 kilowatt culinary water system hydroelectric project linked to the pre-existing town culinary system. Decision based on FERC's EA.
Project Summary
Current Status:
Completed
Location Summary:
East of the Town of Afton
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/01/2010 |
| Comment Period | 05/01/2010 |
| Decision | 06/2010 (Estimated) |
| Implementation | 06/2010 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Greys River Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Town of Afton Culinary Water System Hydroelectric
Decision Signed Date: 06/21/2010
Forests:
Bridger-Teton National Forest
Districts:
Greys River Ranger District
States:
Wyoming
Counties:
Lincoln
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Dave Fogle
671 N. Washington St.
Afton, WY 83110
307-886-5301
dfogle@fs.fed.us
Last Updated: 6/28/2010