Skip to main content

Town of Afton Hydropower

Authorize the Town of Afton to use 8 acres of NF System Land to construct, operate and maintain a 225 kilowatt culinary water system hydroelectric project linked to the pre-existing town culinary system. Decision based on FERC's EA.

Project Summary

Last Updated: 6/28/2010