Authorization of a new water transmission line adjacent to the Bryan Flat Rd./McKoy Rd.
Construction, operation & maintenance of a water transmission pipeline to supply water to 2 residences which. The ROW would be 3661' x 10'. It would be located 10' to the west of the road and be buried 7' below the existing grade of the road.
Project Summary
Location Summary:
Bryan Flat Rd./McKoy Rd. in the Bryan Flat area
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/03/2014 |
Comment Period | 01/06/2014 |
Decision | 02/2014 (Estimated) |
Implementation | 04/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Jackson Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Authorization of a water transmission line - Bryan Flat Rd./McKoy Rd. area
Decision Signed Date: 02/14/2014
Forests:
Bridger-Teton National Forest
Districts:
Jackson Ranger District
States:
Wyoming
Counties:
Teton
Legal Land Description:
T38N, R115W, section 9
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Deidre Witsen
25 Rosencrans Lane
Jackson, WY 83001
307-739-5434
dwitsen@fs.fed.us
Last Updated: 3/10/2014