Deer Creek Drive Power Line Burial
In order to replace an aging and failing electrical underground cable, Lower Valley Energy has requested to dig a trench on NFS lands to bury the cable. The ROW for this cable will be 1,007' long x 24" wide x 42" deep.
Project Summary
Location Summary:
Deer Creek Drive, approximately 1 1/2 miles south of Hoback Junction.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/25/2014 |
Decision | 09/2014 (Estimated) |
Implementation | 10/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Jackson Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
LVE burial of an electrical underground cable along Deer Creek Drive
Decision Signed Date: 09/29/2014
Forests:
Bridger-Teton National Forest
Districts:
Jackson Ranger District
States:
Wyoming
Counties:
Teton
Legal Land Description:
Section 34, T39N, R116W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Deidre Witsen
25 Rosencrans Lane
Jackson, WY 83001
307-739-5434
dwitsen@fs.fed.us
Last Updated: 9/30/2014