Skip to main content

Hoback Campground Host Site - installation of electrical cabling

Burial of an electrical distribution cable in a 715" long x 42" deep x 24" wide trench and installation of a 25 kva transformer that will be 33" x 36" x 24" in order to provide power to the host site.

Project Summary

Last Updated: 7/15/2015