Hoback Campground Host Site - installation of electrical cabling
Burial of an electrical distribution cable in a 715" long x 42" deep x 24" wide trench and installation of a 25 kva transformer that will be 33" x 36" x 24" in order to provide power to the host site.
Project Summary
Location Summary:
Hoback Campground, approximately 8 miles east of Hoback Junction
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/30/2015 |
Decision | 07/2015 (Estimated) |
Implementation | 07/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Jackson Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Hoback Campground Host Site - installation of electrical cabling
Decision Signed Date: 07/07/2015
Forests:
Bridger-Teton National Forest
Districts:
Jackson Ranger District
States:
Wyoming
Counties:
Teton
Legal Land Description:
SW 1/4 Section 1, T38N, R115W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Deidre Witsen
25 Rosencrans Lane
Jackson, WY 83001
307-739-5434
dwitsen@fs.fed.us
Last Updated: 7/15/2015