Wickiup Knoll Communications Site Expansion
To add an 80 ft. tower capable of a 20 ft. extension, a propane tank, an 8 x 16 foot generator building for emergency power and an 11 x 20 foot equipment shelter. This would use 100 x 100 feet within the current site footprint. Access would be cross-country through designated roadless area from private property south of the project area, and require large equipment. A geotechnical survey would be the first stage of the project.
Project Summary
Location Summary:
Wickiup Ridge, east of Osmond, WY, near trail #3191.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/22/2021 |
Decision | 04/2021 (Estimated) |
Implementation | 06/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Greys River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Wickiup Knoll Communications Site Expansion
Decision Signed Date: 04/20/2021
Forests:
Bridger-Teton National Forest
Districts:
Greys River Ranger District
States:
Wyoming
Counties:
Lincoln
Legal Land Description:
Section 20, T31N, R118W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kara Purser
671 N. Washington St.
Afton, WY 83110
307-886-5306
kara.purser@usda.gov
Last Updated: 1/24/2022