DT Upper Carissa Road
DT Mining LLC has proposed a .9 mile extension of FS Road 1108. The extension would follow a previously decommissioned route. The project would consist of grading the entire .9 miles and widening of the road in needed locations.
Project Summary
Location Summary:
Near Deer Trail Mountain. Approximately 5 miles south of Marysvale, Utah.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/11/2023 |
Decision | 03/2023 (Estimated) |
Implementation | 05/2023 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Beaver Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
DT Upper Carissa Road
Decision Signed Date: 03/09/2023
Forests:
Fishlake National Forest
Districts:
Beaver Ranger District
States:
Utah
Counties:
Piute
Legal Land Description:
T28S, R4W, Sections 13 & 14, Salt Lake Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Adam Solt
575 South Main St.
Beaver, UT 84713
435-896-1079
adam.solt@usda.gov
Last Updated: 3/9/2023