Abajo Peak Powerline Replacement
Empire Electric is proposing to replace their existing aerial and buried powerline with a new buried line from a private inholding to the Abajo Peak Communication Site.
Project Summary
Location Summary:
Approximately 6 miles west southwest of Monticello Utah.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/2015 (Estimated) |
Comment Period | 07/2015 (Estimated) |
Objection Period Start | 10/2015 (Estimated) |
Decision | 12/2015 (Estimated) |
Implementation | 01/2016 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Monticello Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Manti-Lasal National Forest
Districts:
Monticello Ranger District
States:
Utah
Counties:
San Juan
Legal Land Description:
T34S R22E, Sec 1 & 12. T34S R23E, Sec 6.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joel Nowak
P.O. Box 820
Monticello, UT 84535
435-636-3364
joelnowak@fs.fed.us
Last Updated: 10/2/2015