Skip to main content

Kamp Claims 1-3 Bulk Sampling Project

This is a new bulk sampling project on the Kamp 1-3 Lode Claims. Three areas would be excavated for sampling, processed off site, and then the site would be reclaimed. Existing and temporary roads would be used. Project duration is about 3 months.

Project Summary

Last Updated: 2/28/2019