Skip to main content

East Branch Weiser River Tributary Culvert Replacement

Removal of a 3-foot round culvert on FS 50577 on an unnamed tributary of the East Branch of the Weiser River and replacement with a 12-foot wide open-bottomed, concrete box structure to provide aquatic organism passage and fish habitat connectivity.

Project Summary

Last Updated: 6/20/2023