Skip to main content

Upper Truckee River Channel and Floodplain Restoration

The Sunset Reach of the Upper Truckee River is planned for restoration activities to improve the natural geomorphic function of the channel by raising the bed elevation and reducing channel size.

Project Summary

Last Updated: 3/29/2012