Truckee River First Four Mile Stream Stabilization and Restoration
The proposed project will protect and restore approximately 900 lineal feet of stream bank, riparian and wet meadow habitat. It will also provide conservation and protection for approximately 2,000 lineal feet of river.
Project Summary
Location Summary:
The project is on NFS lands in four sites along the Truckee River from approximately 1.3 miles below Lake Tahoe Dam to just upstream of Alpine Meadows Road.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/24/2014 |
Decision | 12/2019 (Estimated) |
Implementation | 02/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lake Tahoe Basin Mgt Unit
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management; Vegetation Management (Other Than Forest Products)
Project Activity:
Watershed Improvements
Current Status:
Cancelled
Forests:
Lake Tahoe Basin Mgt Unit
Districts:
Lake Tahoe Basin Mgt Unit
States:
California
Counties:
Placer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joey Keely
35 College Drive
South Lake Tahoe, CA 96150
530-543-2661
joseph.keely@usda.gov
Last Updated: 6/28/2024