El Dorado County Erosion Control - Oflyng
Construct new erosion control structures to reduce stormwater runoff. Add the structures via amendment to an existing special use permit that authorizes El Dorado County erosion control improvements.
Project Summary
Current Status:
Completed
Location Summary:
Located off Pioneer Trail near Garbage Dump Road and Southern Pines Drive in South Lake Tahoe, CA.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/30/2020 |
| Decision | 02/2022 (Estimated) |
| Implementation | 04/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Lake Tahoe Basin Mgt Unit
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Oflyng Erosion Control Project %u2013 El Dorado County
Decision Signed Date: 02/07/2022
Forests:
Lake Tahoe Basin Mgt Unit
Districts:
Lake Tahoe Basin Mgt Unit
States:
California
Counties:
El Dorado
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Lindsay Gusses
35 College Drive
South Lake Tahoe, CA 96150
530-543-2637
lindsay.gusses@usda.gov
Last Updated: 10/18/2022