Bud Lee Placer Mining Plan of Operations
Continued mining using heavy equipment to excavate materials from existing pit, and process with a trommel wash plant 7 sluice box. Occupancy of the site during operations will include tents and a portable toilet.
Project Summary
Location Summary:
The Bud Lee claim is near Richbar, in the Feather River Canyon
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 02/11/2020 |
Comment Period | 02/2022 (Estimated) |
Objection Period Start | 03/2022 (Estimated) |
Decision | 05/2022 (Estimated) |
Implementation | 05/2022 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt. Hough Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Cancelled
Forests:
Plumas National Forest
Districts:
Mt. Hough Ranger District
States:
California
Counties:
Plumas
Legal Land Description:
T25N, R7E, Sec 27
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Donna Duncan
39696 State Highway 70
Quincy, CA 95971
530-283-7614
donna.duncan@usda.gov
Last Updated: 10/5/2023