PG&E Herbicide Vegetation Management Program
PG&E proposes to use herbicides in the right of way of 14 transmission lines in order to reduce the risk of fire and maintain a high standard of reliability. Spraying vegetation along Caribou Road was removed from the analysis.
Project Summary
Location Summary:
Located on the Plumas National Forest within 14 different transmission power lines
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/01/2012 |
| Comment Period | 12/18/2013 |
| Objection Period Start | 06/04/2014 |
| Decision | 10/2014 (Estimated) |
| Implementation | 01/2015 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Plumas National Forest All Units
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
PG&E Herbicide Vegetation Management Program
Decision Signed Date: 10/15/2014
Forests:
Plumas National Forest
Districts:
Mt. Hough Ranger District; Feather River Ranger District
States:
California
Counties:
Butte; Plumas; Yuba
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Erika Brenzovich
159 Lawrence Street
Quincy, CA 95971-6025
530-283-7622
ebrenzovich@fs.fed.us
Last Updated: 11/12/2014