Sunset Consolidated (China Bar) Placer Mining
Use of an excavator to remove material from a terraced area approximately 200 feet upslope of the river. A conveyor, wash plant and sluice box will be used for processing. Water will be pumped from an existing settling pond.
Project Summary
Location Summary:
North Fork of the Feather River, Seneca, CA
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/26/2012 |
Comment Period | 12/24/2013 |
Objection Period Start | 03/04/2014 |
Decision | 03/2014 (Estimated) |
Implementation | 06/2014 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt. Hough Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Decision Notice, Sunset Consolidated (China Bar) Placer Mining Project
Decision Signed Date: 03/04/2014
Legal Notice Date: 03/04/2014
Forests:
Plumas National Forest
Districts:
Mt. Hough Ranger District
States:
California
Counties:
Plumas
Legal Land Description:
T26N, R8E, Section 19
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Donna Duncan
39696 State Highway 70
Quincy, CA 95971
530-283-7650
ledlund@fs.fed.us
Last Updated: 3/26/2014