Skip to main content

Squirrel Creek Mine Exploration Project

Excavation of 20-30 test pits to sample the sub-surface material on the claim. Exacavated material would be processed through a trommel. Water would be pumped from Squirrel Creek to the processing area and discharged to a settling pit.

Project Summary

Last Updated: 11/3/2014