Skip to main content

Ridge Placer Mining Exploration

Excavation of mineral deposits from two test pits using a front loader. Material would be processed through a trommel and sluice. The water source is the Grizzly Mine adit, piped to a 7000 gallon tank. Water is discharged to a rock percolation area.

Project Summary

Last Updated: 8/13/2018