Skip to main content

Ridge Placer Mining Exploration

Excavation of mineral material from 2 test trenches using a front end loader. Material to be processed through a trommel and sluice. Water is piped to a 7000 gallon tank for use in processing, and is discharged to a rock area for percolation.

Project Summary

Last Updated: 12/11/2017