Hawkeye Tunnel Mining Plan of Operations
Incidental surface activities linked to underground exploration of the Hawkeye Tunnel including, deposit of mining operational waste materials from the adit, manual processing of minerals through a sluice box, limited water withdrawal, and occupancy.
Project Summary
Location Summary:
The Hawkeye Tunnel is an existing mine adit located within the Winkeye Consolidated mining claims in the Howland Flat area.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/18/2017 |
Decision | 05/2017 (Estimated) |
Implementation | 07/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Feather River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Hawkeye Tunnel Mining Plan of Operations
Decision Signed Date: 05/30/2017
Forests:
Plumas National Forest
Districts:
Feather River Ranger District
States:
California
Counties:
Sierra
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Donna Duncan
875 Mitchell Avenue
Oroville, CA 95965-4699
530-283-7614
dmduncan@fs.fed.us
Last Updated: 7/18/2017