Soper Wheeler Silver Creek Pipeline Replacement Project
The proposed project includes the replacement of the existing plastic and metal pipe with new high-density polyethylene (HDPE) 14-20 diameter pipe for a total length of 5,405 feet
Project Summary
Location Summary:
The project is located near Meadow Valley, CA adjacent to Silver Creek
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/11/2018 |
| Comment Period | 09/11/2019 |
| Decision | 10/2019 (Estimated) |
| Implementation | 04/2020 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt. Hough Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management; Road Management
Project Activity:
Special Use Authorizations; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Soper Wheeler Silver Creek Pipeline Replacement Project
Decision Signed Date: 10/18/2019
Forests:
Plumas National Forest
Districts:
Mt. Hough Ranger District
States:
California
Counties:
Plumas
Legal Land Description:
T 24 N, R 8 E, Sec 15 & 16
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Leslie Edlund
39696 State Highway 70
Quincy, CA 95971
530-283-7620
leslie.edlund@usda.gov
Last Updated: 3/31/2020