Skip to main content

Four Kings Mining Exploration Project

Operators will excavate an area along the stream bench using a backhoe to dig three test trenches. Trenches are expected to be 30' x 3' x 2'. Material will be processed through a trommel using water pumped from West Branch Lights Creek.

Project Summary

Last Updated: 7/26/2019