PG&E Underground Electric Powerline Special Use Request
PG&E is proposing to install a new underground electric power line within the Highway 70 corridor that will replace approximately 10 miles of the Bucks Creek 1101 12kV pole line that was damaged during the Camp Fire.
Project Summary
Location Summary:
Approximately 10 miles within the Highway 70 corridor between Pulga Road and Cresta Dam.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/23/2019 |
Decision | 07/2020 (Estimated) |
Implementation | 07/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Feather River Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
PG&E Underground Electric Powerline Special Use Request
Decision Signed Date: 07/02/2020
Forests:
Plumas National Forest
Districts:
Feather River Ranger District
States:
California
Counties:
Butte; Plumas
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Erika Brenzovich
875 Mitchell Avenue
Oroville, CA 95965-4699
530-283-7622
ebrenzovich@fs.fed.us
Last Updated: 7/6/2020