Gansner Undergrounding PGE
PG&E is undergrounding ~1.7 mi of the Gansner 1101 12 kV Line between Paxton and Spanish Crk CG within Plumas NF. These power lines were damaged in 2021 Dixie Fire. Trenching and boring along the midline of SR 70, 42-110 inch depth, 24 inch wide.
Project Summary
Location Summary:
State route 70 corridor, Plumas county, between Paxton, CA and Spanish Crk Campground
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/28/2023 |
Decision | 03/2024 (Estimated) |
Implementation | 06/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Mt. Hough Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management
Project Activity:
Electric Transmission; Facility Improvements/Construction
Current Status:
Completed
Project Decision Information
Gansner Undergrounding PGE
Decision Signed Date: 03/19/2024
Forests:
Plumas National Forest
Districts:
Mt. Hough Ranger District
States:
California
Counties:
Plumas
Legal Land Description:
T.25N., R.9E., sections 8, 9, 10, 15, 16, 17, MDM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Erika Brenzovich
39696 State Highway 70
Quincy, CA 95971
530-283-7622
erika.brenzovich@usda.gov
Last Updated: 10/28/2024