Skip to main content

Calfire Pilot Rock Conservation Camp

Improve water supply and distribution and treated waste water disposal, by replacing an existing well, installing a permanent power supply to wells, constructing a 50,000-gallon potable water tank, removing an existing tank, and connecting a sewer.

Project Summary

Last Updated: 3/22/2010