Southern California Edison - Acosta Circuit Plant Betterment Project -San Sevaine

SCE is proposing to replace a failing CIC cable that currently runs from pole X5826E to burd switch S5311726 located with an existing cell site. The project will consist of 1,500 feet of new trench and three box-pulling structures.

Project Summary

Last Updated: 3/28/2014