SCE - Doble Circuit Grid Reliability and Maintenance Project
The Southern California Edison Co. is proposing to replace 385 wood poles with light weight steel poles; replace, remove and install 200 anchors and down guys; and re-conductor the overhead 33kV line along the Doble Circuit.
Project Summary
Current Status:
Cancelled
Location Summary:
The proposed project is located west of Highway 18 in Lucerne Valley between the Cottonwood substation to the north and the Gold Hill substation to the south, in San Bernardino County, California.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/16/2017 |
| Decision | 10/2022 (Estimated) |
| Implementation | 11/2022 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
San Bernardino National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Forests:
San Bernardino National Forest
Districts:
Big Bear Ranger District
States:
California
Counties:
San Bernardino
Legal Land Description:
Multiple sections of Township 3 North, Ranges 1 and @ East, SBBM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Anderson
602 S. Tippecanoe Ave
San Bernardino, CA 92408
909-382-2690
david.anderson2@usda.gov
Last Updated: 6/19/2024