PACIFIC GAS AND ELECTRIC TULE RIVER VEGETATION MANAGEMENT PROJECT
This project is a maintenance program involving the use of herbicides to control vegetation around hydropower facilities, access roads and trails.
Project Summary
Location Summary:
Tule River Hydroelectric Powerhouse, Adm Bldgs, Switchyard, Camp 4 Rd,ROWs-Tunnel Trail, Penstock Trail, Redwood Penstock, Adit Road, Surge Tank Road,
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/05/2013 |
Comment Period | 07/05/2013 |
Objection Period Start | 01/2018 (Estimated) |
Decision | 02/2018 (Estimated) |
Implementation | 05/2018 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Western Divide Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Facility Management
Project Activity:
Facility Maintenance
Current Status:
Cancelled
Forests:
Sequoia National Forest
Districts:
Western Divide Ranger District
States:
California
Counties:
Tulare
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Chris Sanders
32588 Highway 190
Springville, CA 93265
559-539-2607 ext.270
csanders@fs.fed.us
Last Updated: 7/20/2018